White Mountain Mining Consortium - GPU Datacenter
-
Left for the weekend to visit mothers, got home to a 85f house… holy crap its time to get the rest of the rigs out of my house.
-
Oooh toasty who needs a sauna lol
-
One thing to try with your dead cards. I had a dead 5970 that i thought was kaput. I took everything i could off it and placed it in the oven at 190c for 10 minutes, then re-assembled. This was back in January i think and it has been hashing perfectly 24/7 ever since! Deffo worth a try! What have you got to loose?
:D
-
Nice!
-
I’ve baked GPUs before and got them working but they eventually fail again.
-
Server chassis are out of production, powder coat this week, then shipped up here to the data center (no those are not all mine…i wish)
[attachment=60:ServerChassis.jpeg]
-
If anyone is interested in renting out a 2.1+ MH/s Scrypt-N(Can mine anything else): 6x r9 280x rig please pm me. I am looking for a first customer and a reviewer for my services.
Here are my terms:
10 Month Contract
All electricity, cooling, maintenance fees, and constructions costs are included
Miners will mine the coin of your choice on any pool (1 pool per month with basic package)
At the end of the contract I retain all hardware, If you would like to renew at that time you may at a discount
If anything breaks or the machine goes down for any reason you will be compensated with either immediate hash power from our reserves and/or extension of the contract to cover the down time
If hardware breaks, I will replace it at no cost to you and I will compensate you for any down time required to complete the fix
What you have to do:
Buy a mining contract and let me know where you would like your machine to mine, that’s it, I will do the rest for you. There are no hidden fees or % cuts from your profits, you pay for everything up front. There are no pre-orders to cover costs, when you rent your hash power from us it comes from machines running already in our data center.
Pricing 6x r9 280x Hosted for 10 Months:
Basic: $3900 (1 pool change per month)
Advanced: $3950 (3 pool changes per month)
Ultimate Pool Hopper: $4100 (Unlimited pool changes, updates to mining algorithms, new mining algorithms/coins, priority over Basic and Advanced customers)
I accept: BTC, FTC, LTC, DRK, VTC for this promotion
-
I just received word that the 2x 6 GPU server chassis I ordered came out of painting today. They should be shipped and on their way to the data center tomorrow. I would guess that I will have them up and running with photos by the middle of next week. I am still looking for a first customer who is interested in renting out the miner and providing a review post here and/or send me a pm. If I don’t get anyone no skin off my back, all of the hardware is paid for and will mine for me.
-
I like the concept, but I did some math on the prices and it’s almost impossible to make ROI as it is right now. Are these prices aimed more towards users wanting to mine after a possible algo change? :)
-
The aim is to simply have a set it and forget GPU miners. Depending on the package you buy I will also do the work to add more algorithms to miners and do all the heavy lifting for you. On top of that I RMA all of the hardware if it breaks, I compensate for downtime and replace broken hardware. You get the hashrate you bought for the time you bought it guaranteed. With Bitcoin prices under $500 almost no GPU miners were looking at a straight ROI if sold when mined, however as bitcoin prices go up the ROI numbers change drastically. Unlike ASIC vendors I will not price adjust due to increases or decreases of ROI, my prices are sole based on a per unit usage of space in the data center and computer hardware costs.
Tired of dealing with GPU mining rigs and having to fix them, add or update mining software, finding optimized GPU settings, or deal with broken hardware? I have all of it covered, just tell me what pool you want to mine at and the machine is yours to use.
-
After a two weeks worth of trouble shooting I finally have my first two servers stable 24/7/365. Found out that the default debian network manager has a bug when using static IPs, whenever the network would drop briefly and reconnect network manager would crash the kernal and make the rig unresponsive. Pictures soon to come, hopefully around 5pm est tonight.
My remaining 3x 6 GPU 4u rackmount server chassis got shipped yesterday and are on my way to me which is good because having all those GPUs sitting is just killing me!
-
Empty 4u 6x GPU Chassis
[attachment=74:1.jpg]
Outside row of standoffs were not correctly placed
[attachment=75:2.jpg]
Holes left from standoff rivets
[attachment=76:3.jpg]
The Build Begins
[attachment=77:4.jpg]
BREWSKI SAYS LOOK AT ME!!!
[attachment=78:5.jpg]
Assembled
[attachment=79:6.jpg]
Evga PSU DOA, using backup Seasonic 1250
[attachment=81:8.jpg]
Assembling Rack
[attachment=80:7.jpg]
Got it running smooth
[attachment=84:9.jpg]
So much work, I am pooped
[attachment=83:10.jpg]
-
p0rn!
-
More pix to come, been so busy these have taken a back seat. I have rig #3 built and running, #4 is built and needs to be setup. Managed to tear my rotator cuff moving full servers around by myself so now I cant work unless I have help from my lovely girlfriend. While installing #3 into the rack last night I tapped one of my exhaust fans and the motor shredded itself and now will not run properly.
I have managed to get building these down to a science almost, it took close to 4 hours to get the first one built. I managed to almost completely assemble rig #4 in about an hour yesterday.
-
Looks amazing
-
I didn’t think going from 2 rigs to 3 was going to be noticeable, after playing with GPUs for over a year now to mine with I am accustomed to this hardware. Once I hoisted the third rig up, slid it in place, and started it the grandness hit me… there is just a massive wall of hot air and noise coming from this 4+ foot tall wall of computers. I wont have enough GPUs to finish rig #5 for probably another month but after 6 months of work and planning I am so happy to see the light at the end of the tunnel.
-
Until the next price surge I wont bother renting any of these rigs. If someone is really interested in renting some hashrate from me send me a pm and I can try and work out a deal. If you want to use these for other cryptographic/compute functions let me know and I could rent them out for that too.
If any pool operators would like me to point my 30ish GPUs at your pool after neo scrypt comes out let me know. I am looking for someone with PPAgent support.
Due to summer heat/cooling I don’t have everyone running ATM but you can view the farm here:
http://exemerged.poolz.net/EPHxwPdnTA3MR2ZgzfZZgyCCjWMwYwUNie
Waiting on right angle 12x USB pack and I have a 6x r9 280x rig offline due to technical problems.
-
Done, Built, Running. Only 21 of a possible 30 GPUs are running.
[attachment=157:1 (13).jpg]
[attachment=158:1 (14).jpg]
-
That’s some serious looking kit!
-
Mate, that’s a sexy looking setup you have there!